SMP Controllers


Minwa SMP Controller
Conversion kit for existing UP
Most economic
Cut down electricity bill
Roi within 3 years
Easy installation
Season wise user end settings compatible
Most useful to remote places.
User friendly can be used off grid and hybrid.
Mains charging can be set for required level by user end according to power cut and sunshine availability.
How does it work?
This is a fully automatic solar charge controller which can also control the AC supply to the inverter when ac charging is required and having a change over system from grid to solar and back, whenever necessary or as per pre-set.This is required to prioritize of solar energy and cut down the grid usage. The inbuilt digital controller senses the battery voltage and accordingly controls the load connection to grid and inverter as per the settings, which can be set according to the weather condition.In Brief, when the battery gets fully charged the load will be connected to inverter and according to the connected load the solar energy will be consumed, In the meantime the electricity will be saved. After the utility of the entire solar energy stored in the day, again the load will be shifted to grid. The remaining energy stored in the battery (according to the battery capacity) will be utilised during power cuts and cloudy days.When sun shine is not enough to charge the battery it can be charged through grid for the required level by setting the controller for as per the table provided. Always keep it minimum and increase only when it is essential, so that maximum power can be saved and the solar power can be prioritized.
SPECIFICATIONS:
Charge controller: zero drop /MPPT
Switching: microcontroller based
Voltage range: 12 v. to 96 v.
Current: 20- 40 a.
Load: 5 kva.
Set up table
Set according to the inverter capacity approximately 1 : 100 watt
SL ON
SL OFF
CH ON
CH OFF
LOAD
1.Press set key
2.Press set key
3.Press set key
4.Press set key
5. press set key
STEP NO.
Display
Set required voltage level using UP OR DOWN Buttons
NOTE : Always keep Mains charging level minimum. 10 v. (step 3 & 4 )Increase during cloudy day power Cuts Only.
Step 1. 14 .2 v.,
Step 2. 11.5 v.
Step 3. 10 to 14 v.
Step 4. 14 v.Multiply by no. of batteries
* For higher capacities. Ex. 14.2x 2 for 2 batteries 24 v. system.
Preferred volt. for 12 v. single battery :